top of page

Magnicator® Quick Ship Program

Jun 14, 2023
2 min read

Updated: Aug 10

We are excited to relaunch our Magnicator® Quick Ship Program. Orders entered by 12 noon Eastern Time ship within 2 business days.

  • Common options and accessories

  • Includes indicators and floats for retrofit applications

  • Easy configuration guide


Why Fast Lead Times Matter for Level Instrumentation

A Magnicator failure or an unplanned instrumentation gap doesn't wait for a convenient time in a facility's procurement schedule. When a plant discovers it needs a replacement float, indicator, or accessory - whether from equipment damage, an unexpected failure, or a retrofit project that's already underway - the standard engineered-to-order lead time for custom instrumentation can turn a straightforward fix into an extended outage.

The Quick Ship Program addresses this directly by covering common options and accessories that can ship within 2 business days when ordered by the noon Eastern cutoff, rather than requiring the full custom manufacturing lead time every time.


Built for Retrofit Applications

The program specifically includes indicators and floats suited for retrofit applications - the kind of situation covered in our article on eliminating crushed floats, where a facility needs a replacement float quickly after a commissioning error, or simply needs to upgrade an aging indicator without waiting weeks for a custom order. Having common retrofit components available on a fast-ship basis turns what could be an extended instrumentation gap into a short, manageable turnaround.


An Easy Configuration Guide Removes Ordering Friction

Speed only helps if ordering the right configuration is also fast. The program's configuration guide is built to make specifying the correct options and accessories straightforward, reducing the back-and-forth that can otherwise slow down even a fast-shipping order.


Why This Matters for Facility Reliability

Facilities running continuous operations - power generation, chemical processing, oil and gas - can't always plan every instrumentation need months in advance. A program built around common options, retrofit-ready components, and a fast, straightforward ordering process directly supports the kind of rapid response a facility needs when reliability depends on getting the right part in place quickly, not eventually.


Applications

The Quick Ship Program is valuable for:

  • Unplanned Maintenance: Replacing a damaged or failed Magnicator component without an extended wait

  • Retrofit Projects: Upgrading existing installations with common indicator and float configurations

  • Facilities with Limited Downtime Windows: Where a fast turnaround directly reduces outage duration


Learn More

For details on the Magnicator Quick Ship Program, configuration options, and ordering cutoffs, contact our Jerguson team.


Email: sales@clark-reliance.com Phone: +1 (440) 572-1500


Related Products & Resources:


bottom of page